CRE - Asynchronous Learning

Unit 17

Unsteady State

Objectives After completing Unit 17 of the text and associated CD-ROM material, the reader will be able to
  • Analyze batch reactors and semibatch not operated isothermally
  • Analyze the start up of nonisothermal CSTRs
  • Analyze perturbations in temperature and presence for CSTRs bein operated at steady state and describe under what conditions the reactors can be unsafe (safety)
  • Describe the effects of adding a controller to a CSTR
  • Analyze multiple reactions in batch and semibatch reactors not operated isothermally
Reading Assignment Text:            Chapter 9, pages 591-644

   
Time Estimate: 2 1/2 hours
Problem Assignment P9-5
   
Time Estimate: 4 1/2 hours
Study Problems P9-3
P9-6
Other Take Exam II. Find another proctor to administer exam. E-mail proctor information to sfogler@umich.edu if different from first exam.
     
   
Unit 17 Total Time Estimate: 6 hours